- Apparent losses
- Water consumed but not recorded: unauthorised consumption, customer meter under-registration and data-handling errors. Also called commercial losses. Valued at the tariff.
- AWWA M36
- The American Water Works Association manual that codifies the IWA water balance as the US 'water audit'.
- Background leakage
- Small, undetectable leaks at joints and fittings that run continuously; part of the unavoidable annual real losses.
- CARL
- Current annual real losses: the real losses a system actually has, usually expressed in m³/day or litres per connection per day.
- Commercial losses
- Another term for apparent losses, used by the World Bank.
- DMA
- District metered area: a hydraulically discrete part of a network, typically 500–3,000 connections, with all inflows metered so that leakage can be measured from night flow.
- Economic level of leakage (ELL)
- The level of leakage at which the cost of reducing it further equals the value of the water saved.
- ILI
- Infrastructure Leakage Index: CARL ÷ UARL. A ratio of current to unavoidable real losses; 1.0 is the technical floor. Banded A1–D by the World Bank Institute.
- Intermittent supply
- Supply that is not pressurised 24 hours a day. Indicators are corrected to 'when the system is pressurised' for comparison.
- Marginal cost of water
- The variable cost of producing and distributing one more cubic metre — energy, chemicals, bulk purchase. Used to value real losses.
- Minimum night flow (MNF)
- The lowest flow into a DMA, usually between 2 and 4 a.m., when legitimate use is smallest and leakage dominates.
- N1 exponent
- The exponent relating leakage to pressure (L ∝ P^N1); typically 1.0–1.5, higher for flexible pipes and background leakage.
- Non-revenue water (NRW)
- System input volume minus billed authorised consumption: unbilled authorised consumption plus apparent losses plus real losses.
- Pressure management
- Controlling network pressure with valves and zoning to reduce leakage and burst frequency.
- Real losses
- Physical leakage from mains, service connections and storage up to the customer meter. Calculated as the residual of the top-down balance.
- Revenue water
- Water that is billed — the same as billed authorised consumption.
- Service connection
- The pipe connecting a main to a customer property; the unit for per-connection indicators. One block of flats on one pipe is one connection.
- Service pipe length (Lp)
- Total length of service pipe between property boundaries and customer meters; zero when meters are at the boundary.
- System input volume (SIV)
- The volume of treated water entering the distribution system in the balance period, from all sources, corrected for bulk-meter error.
- Top-down / bottom-up
- Top-down: the water balance, real losses as a residual. Bottom-up: night-flow measurement in DMAs. A sound programme reconciles both.
- UARL
- Unavoidable annual real losses: (18 × km mains + 0.8 × connections + 25 × km service pipe) × pressure (m) litres/day. The technically achievable leakage floor.
- Under-registration
- The share of consumption a customer meter fails to record, mostly at low flows and on aged meters.
- Water losses
- System input volume minus authorised consumption; the sum of apparent and real losses.
- w.s.p.